Key numbers from this manual

As printed in the manual, with metric and US units side by side. The typical range comes from all refrigerator manuals on this site that print the same figure.

Water filter replacementat least every 6 monthsModels with water filtersTypical for refrigerators: 6 monthsp. 4
Replacement filterUKF8001AXX-750 or UKF8001AXX-200Replacement water filterp. 12
Water supply pressureat least 35 psi (241 kPa)Water dispenser operationp. 15
Time to cool down24 hoursfor the refrigerator to cool down and chill waterTypical for refrigerators: 4 to 24 hoursp. 11
Door-open alarm after5 continuous minutesrefrigerator door left openTypical for refrigerators: 1 to 5 minutesp. 10
First ice after installation24 hoursAfter new ice-maker installation; full production takes 72 hoursTypical for refrigerators: 12 to 24 hoursp. 14
Ice production8 to 12 batches of ice in a 24-hour periodApproximate ice production.approximately 8 to 12 batchesp. 11
Clearance above¹⁄₂" (1.25 cm) needs less space than mostVentilation space above refrigeratorTypical for refrigerators: 1 to 3.9 in (2.5 to 9.9 cm)p. 3
Clearance at the sides¹⁄₂" (1.25 cm) needs less space than mostVentilation space on each sideTypical for refrigerators: 0.7 to 3.1 in (1.8 to 7.9 cm)p. 3
DefrostautomaticallyRefrigerator and freezer sectionsautomaticrefrigerator and freezer sectionsp. 12
Sabbath modeYesif the control center includes this preferencep. 10
Control lockYesdispenser lock deactivates the dispenser leverp. 12

Maytag Refrigerator questions

Answers taken from this manual. Each one links to the page it comes from.

What do the water filter status lights mean?
  • Yellow Order means the filter will need replacement soon.
  • Red Replace means install a new water filter.

Manual: page 12

How long should I wait before adding food after installing the refrigerator?

Wait 24 hours for complete cooling before adding food.

Manual: page 8

How do I adjust the refrigerator or freezer temperature?

Inspect the air vents for blockage before changing either temperature control.

  1. Press an arrow once to show the current temperature set point.
  2. Adjust the REFRIGERATOR or FREEZER control for the compartment needing a change.
  3. After startup, change no more than one control setting at a time.
  4. Allow 24 hours between changes so the temperature can stabilize.

Manual: page 9

Why is there moisture inside my refrigerator?

Some moisture buildup is normal.

  • Humid room. Room humidity contributes to moisture buildup.
  • Doors opened often or left open. Minimize openings and close doors fully.

Manual: page 14

How much ice should the maker produce, and when?

Allow 24 hours for the first batch; production and bin filling take longer.

MilestoneTime or rate
First batch24 hours
Storage bin completely full3 days
Ice productionApproximately 8 to 12 batches in 24 hours

Other brands: LG 49-56 · Samsung 100 to 130 cubes in a 24-hour period · Marvel seven to nine batches of ice per 24 hour period Compare all

Manual: page 11

How do I turn on the ice maker and prepare its first ice?
  1. Run the water-system flush before activating ice production.
  2. Move the ice maker switch to ON.
  3. Wait 24 hours for the initial ice batch.
  4. Discard the first three ice batches.

Other brands: LG about 48 hours · Samsung 12 hours · Marvel 24 to 48 hours Compare all

Manual: page 10, page 11

What does the hinged seal between the refrigerator doors do?

The hinged seal folds inward when the left door opens and seals the gap when both doors close.

Manual: page 8

How do I make a refrigerator door close more easily?

Adjust the front leveling screws to tilt the refrigerator slightly toward the rear.

  1. Remove the base grille by pulling it toward you.
  2. Use a ¹⁄₄" hex driver to adjust the leveling screw on each side.
  3. Turn both screws clockwise to raise the refrigerator or counterclockwise to lower it.
  4. Open the door and test its closing; turn both screws clockwise equally if needed.
  5. Replace the base grille.

Manual: page 8

Maytag Refrigerator compared with other brands

Refrigerators from other brands with the most of the same figures in their manuals. Values as printed in each manual.

Maytag RefrigeratorWhirlpool RefrigeratorFrigidaire RefrigeratorKitchenAid Refrigerator
Water filter replacementat least every 6 monthsat least every 6 monthsevery 6 monthsat least every 6 months
Replacement filterUKF8001AXX-750 or UKF8001AXX-200UKF8001AXX-200Part #FPPWFU02UKF8001AXX-750 or UKF8001AXX-200
Water supply pressureat least 35 psi (241 kPa)at least 35 psi (241 kPa)30 to 100 psi (207 to 690 kPa)at least 35 psi (241 kPa)
Time to cool down24 hours24 hours24 hours24 hours
Door-open alarm after5 continuous minutes5 minutes5 minutes or more3 continuous minutes
First ice after installation24 hours24 hourswithin 24 hours24 hours
Ice production8 to 12 batches of ice in a 24-hour periodabout 8 to 12 batches of ice in a 24-hour period3.2 to 3.7 pounds of ice per 24 hoursabout 8 to 12 batches of ice in a 24-hour period

Similar Maytag refrigerators

Maytag Refrigerator Instruction ManualInstruction Manual88 pages
Maytag Refrigerator Instruction ManualInstruction Manual88 pages
Maytag Refrigerator Instruction ManualInstruction Manual68 pages
Maytag Refrigerator Instruction ManualInstruction Manual66 pages
Maytag Refrigerator User InstructionsInstruction Manual62 pages
Maytag Refrigerator User ManualInstruction Manual61 pages
Maytag Refrigerator Instruction ManualInstruction Manual56 pages
Maytag M9RXDGFYM11User Manual56 pages
All Maytag refrigerators →