How do I lay out and lock the walk-in floor panels?
  1. Mark the floor and level it according to site preparation requirements.
  2. Arrange panels in the drawing’s sequence, keeping the flooring level.
  3. Lock the panels together with edges flush and square.

Manual: page 15

How do I install screeds around a cold-room enclosure?
  1. Lay the screeds on the floor along the chalk lines.
  2. For freezer floors, center the screed over the thermal break and isolate the interior concrete.
  3. Apply two beads of non-drying butyl sealant beneath each screed.
  4. Begin at a rear corner and secure two adjoining walls with the supplied fasteners.
  5. Use at least two fasteners per screed section, one at each end, including under doors.
  6. Space fasteners no more than four feet apart on long screed sections.
  7. Leave the remaining walls unfastened until the first two walls are assembled.

Manual: page 12

How do I install the plug buttons?
  1. Remove any protective covering from the panels.
  2. Verify that all cam locks are engaged.
  3. Place plug buttons in the cam lock wrench access holes.
  4. Tap each button firmly with a rubber mallet.

Manual: page 23

Where can I make penetrations in walk-in panels?
  • Avoid areas within a 6” radius of cam lock holes or 2” of panel seams.
  • Seal every penetration with insulation, foam, or similar material.
  • Seal electrical penetrations on both the inside and outside.
  • Do not make penetrations in outdoor ceilings.

Manual: page 23

How do I finish a walk-in flooring overlay?
  1. Continue positioning and securing sheets until their edges are flush.
  2. Seal every flooring-overlay seam and edge with caulk.
  3. Wait 1-3 hours for adhesive or sealant to dry before using the walk-in.

Manual: page 17

When does an indoor walk-in enclosure need ceiling support?

More than 14’-8” in both length and width requires support for the ceiling panels.

  • Use suspended ceiling hangers.
  • Use foamed-in super ceiling channel.
  • Use exterior self-support steel beams.
  • Use interior steel beams with column supports.

Manual: page 21

How do I install an interior walk-in ramp?

Use the floor panel layout and seal the ramp connections.

  1. Review the floor panel layout on the assembly drawing.
  2. Apply sealant where the ramp cavity meets concrete and the floor.
  3. Install the ramp and fasten it in place.
  4. Apply sealant along every ramp edge.

Manual: page 22

Similar Manitowoc walk-in coolers & cold rooms

Manitowoc Foodservice Walk-In DivisionUser Manual84 pages
Manitowoc Foodservice Walk-In DivisionOperating Instructions43 pages
Manitowoc Foodservice Walk-In DivisionOperating Instructions43 pages
Manitowoc Foodservice Walk-In DivisionOperating Instructions32 pages
Manitowoc Foodservice Walk-In DivisionOperating Instructions32 pages
Manitowoc Foodservice Walk-In DivisionInstruction Manual24 pages
Manitowoc Foodservice Walk-In DivisionOperating Instructions16 pages
Manitowoc Foodservice Walk-In DivisionOperating Instructions14 pages
All Manitowoc walk-in coolers & cold rooms →