Key numbers from this manual

As printed in the manual, with metric and US units side by side. The typical range comes from all commercial refrigerator manuals on this site that print the same figure.

Time to cool down6 hoursBefore placing product in the case after startupTypical for commercial refrigeration: 1 to 24 hoursp. 7
Clearance above10”Minimum air space above the cabinetTypical for commercial refrigeration: 0 to 12 in (0 to 30.5 cm)p. 7
Clearance at the sides0”Minimum air space at each sideTypical for commercial refrigeration: 0 to 4 in (0 to 10.2 cm)p. 7
Clearance behind6” needs more space than mostMinimum air space at the rearTypical for commercial refrigeration: 1 to 4 in (2.5 to 10.2 cm)p. 7

Master-Bilt Commercial Refrigerator questions

Answers taken from this manual. Each one links to the page it comes from.

How do I set the case temperature?

Set the temperature control for the desired temperature range.

Manual: page 8

When can I load product after starting the case?

Wait at least 6 hours after starting the case before placing product inside.

Manual: page 7, page 8

Where should I place the Master-Bilt case?

Place it in an air-conditioned store at or below 75 °F and 55% relative humidity or less, away from sun, radiant heat, and nearby airflow. Leave 6” behind it against a wall and 10” above the cabinet.

Manual: page 4

How do I route the case drain?

Use the included P-trap and route the drain tubing into the condensate pan.

  1. Install the included P-trap on the case drain.
  2. Check that the drain tubing is trapped and enters the condensate pan.

Manual: page 4

What should I do if my shipment arrives damaged?

Inspect the shipment on arrival, then act promptly if unpacking reveals concealed damage.

  1. Inspect all cartons and crates when they arrive.
  2. Record damage or shortages on every bill of lading copy before signing.
  3. Call the delivering truck line immediately if damage appears after unpacking.
  4. Submit a written report, request immediate inspection, and retain the crating material.

Manual: page 6

What should I provide when selling or giving away the cabinet?

Give the buyer every safety label and the Installation Service Manual with the cabinet. Contact Master-Bilt customer service during the transfer or disposal so its new location can be recorded.

Manual: page 12

Master-Bilt Commercial Refrigerator compared with other brands

Commercial Refrigeration from other brands with the most of the same figures in their manuals. Values as printed in each manual.

Master-Bilt Commercial RefrigeratorTrue T-23-HCEdgeStar VBM101SSKoolmore KM-FMD12SGD
Time to cool down6 hours24 hoursat least 24 hoursabout 1 hour
Clearance above10”0" (0 mm)1/2”over 4 inches (10.2 cm)
Clearance at the sides0”0" (0 mm)1/2”at least 4 inches (10.2 cm)
Clearance behind6”1" (25.4 mm)3/4”3 inches (7.6 cm)

Similar Master-Bilt commercial refrigeration

Master-Bilt Commercial Refrigeration Instruction ManualInstruction Manual18 pages
Master-Bilt GT-30Instruction Manual16 pages
Master-Bilt GT-50Instruction Manual15 pages
Master-Bilt TEL-2-30User Manual6 pages
Master-Bilt MCR-33-101User Manual6 pages
Master-Bilt BEL-3-24User Manual6 pages
All Master-Bilt commercial refrigeration →