Key numbers from this manual

As printed in the manual, with metric and US units side by side. The typical range comes from all commercial refrigerator manuals on this site that print the same figure.

Wait before use24 hoursAfter leaving the cabinet upright before plugging it into a power sourcep. 5
Time to cool down24 hoursBefore loading product into the TRUE unitTypical for commercial refrigeration: 1 to 24 hoursp. 15
Clearance above1" (25.4 mm)Required clearance at the topTypical for commercial refrigeration: 0 to 12 in (0 to 30.5 cm)p. 4
Clearance at the sides1" (25.4 mm)Required clearance at the sidesTypical for commercial refrigeration: 0 to 4 in (0 to 10.2 cm)p. 4
Clearance behind1" (25.4 mm)Required clearance at the backTypical for commercial refrigeration: 1 to 4 in (2.5 to 10.2 cm)p. 4

True TBB-1-HC questions

Answers taken from this manual. Each one links to the page it comes from.

How long should I run the cooler before loading product?

24 hours, with the TRUE unit empty, before loading product.

Manual: page 15

How long should the refrigerator stand before I plug it in?

Leave the cabinet upright for 24 hours before plugging it into a power source.

Other brands: Other 24 hours · Summit about 2 hours · Whynter about 4 hours Compare all

Manual: page 5

Why hasn’t the compressor started after I plugged in the refrigerator?

An initial defrost event may delay the compressor or evaporator fan, and it lasts at least 6 minutes.

Manual: page 16

True TBB-1-HC compared with other brands

Commercial Refrigeration from other brands with the most of the same figures in their manuals. Values as printed in each manual.

True TBB-1-HCConserv Commercial RefrigeratorOther Commercial RefrigeratorSummit FF64BCSS
Wait before use24 hoursat least 2 hoursat least 24 hoursabout 2 hours
Time to cool down24 hours4 to 6 hours··
Clearance above1" (25.4 mm)2" (5 cm)12" (30.5 cm)4” (102mm)
Clearance at the sides1" (25.4 mm)2" (5 cm)2" (5.1 cm)5” (127mm)
Clearance behind1" (25.4 mm)2" (5 cm)2" (5.1 cm)5” (127mm)

Similar True commercial refrigeration

True TBR32-RISZ1-L-B-S-1Installation Manual56 pages
True TBR32-RISZ1-L-B-S-1Service Manual56 pages
True TSCI-150PR-SWG-RInstallation Manual68 pages
True GDM-49-SCI-HCInstallation Manual56 pages
True GDM-49-SCI-HCInstallation Manual56 pages
True GDM-23-HST02-HCInstallation Manual48 pages
True GDM-23-HST02-HCInstallation Manual48 pages
True TRM2L******#*******#Owner's Manual48 pages
All True commercial refrigeration →