Key numbers from this manual

As printed in the manual, with metric and US units side by side. The typical range comes from all commercial refrigerator manuals on this site that print the same figure.

Wait before use24 hoursafter the cabinet is upright and before plugging into a power sourcep. 5
Time to cool down24 hoursBefore loading product, run the TRUE unit empty to verify proper operation.Typical for commercial refrigeration: 1 to 24 hoursp. 11
Clearance above0" (0 cm)TCGG cabinetTypical for commercial refrigeration: 0 to 12 in (0 to 30.5 cm)p. 4
Clearance at the sides0" (0 cm)TCGG cabinetTypical for commercial refrigeration: 0 to 4 in (0 to 10.2 cm)p. 4
Clearance behindOpenTCGG cabinetTypical for commercial refrigeration: 1 to 4 in (2.5 to 10.2 cm)p. 4

True TCGG-36-S-LD questions

Answers taken from this manual. Each one links to the page it comes from.

What does def mean on the temperature display?

def means the cabinet is in defrost; the display may continue showing it briefly after defrost ends.

Manual: page 12

How long should I run the cabinet before loading product?

24 hours: run the TRUE unit empty first to verify proper operation before loading product.

Manual: page 11

What installation clearances does the TCGG cabinet require?

The TCGG cabinet requires these clearances, along with sufficient airflow.

LocationClearance
Top0"
Sides0"
BackOpen

Manual: page 4

How much space do adjustable legs provide under the cabinet?

6" (152 mm) of clearance is provided under the cabinet by adjustable legs.

Manual: page 6

Why does the cabinet temperature rise during defrost?

Defrost can make the displayed temperature higher than normal, and the display does not show product temperature. Check the product temperature to judge cabinet operation most accurately.

Manual: page 12

How do I level the TCGG cabinet?
  1. For leveling legs, thread them into the cabinet rail.
  2. Check that the cabinet is level.
  3. If it is low, gently support the low end.
  4. Turn the leveling-leg bottom stem with an adjustable wrench until supported and level.
  5. For castors, loosen the bolt and insert the provided shims.
  6. Set multiple shim slots 90˚ apart, then tighten and secure the castors.
  7. Check level front-to-back, side-to-side, near the doors, rear, and both sides.
  8. Adjust any center screw, castor, or leg until it fully contacts the floor.

Manual: page 6, page 7

How do I install a stainless steel shelf?
  1. Lift each door from its track without disconnecting the elastic tubing, then set doors beside the unit.
  2. Place shelf supports into the interior pilasters as matching left and right pairs at the desired height.
  3. Set the stainless steel shelf with its product stop facing the cabinet front.
  4. Overlap the shelf side flaps with supports and fit each support tip into the shelf’s front slot.
  5. Plug the shelf light into the receptacle.
  6. Reinstall the doors.

Manual: page 9

Why aren’t the shelf lights working?

Connect the shelf light to the receptacle; the lights will not operate when unplugged.

Manual: page 9

True TCGG-36-S-LD compared with other brands

Commercial Refrigeration from other brands with the most of the same figures in their manuals. Values as printed in each manual.

True TCGG-36-S-LDConserv Commercial RefrigeratorOther Commercial RefrigeratorSummit FF64BCSS
Wait before use24 hoursat least 2 hoursat least 24 hoursabout 2 hours
Time to cool down24 hours4 to 6 hours··
Clearance above0" (0 cm)2" (5 cm)12" (30.5 cm)4” (102mm)
Clearance at the sides0" (0 cm)2" (5 cm)2" (5.1 cm)5” (127mm)

Similar True commercial refrigeration

True TCGR-50-CDModel family TCGInstallation Manual20 pages
True TCR-1-2-CL-SSI-3D-3DInstallation Manual21 pages
True TCMInstallation Manual16 pages
True TSCI-150PR-SWG-RInstallation Manual68 pages
True GDM-49-SCI-HCInstallation Manual56 pages
True GDM-49-SCI-HCInstallation Manual56 pages
True TBR32-RISZ1-L-B-S-1Installation Manual56 pages
True TBR32-RISZ1-L-B-S-1Service Manual56 pages
All True commercial refrigeration →